TFR Delivers Space-Age Flooring to NASA
Where will you find an epoxy flooring company that manufactures,
warranties and installs their own product without interrupting production
schedules? TFR, based in Toledo, Ohio fit the bill.
Lockheed Martin Michoud Operation needed a company to provide
high compressive strength, durability, reflectivity, and more level
working surfaces in a quality flooring system covering over 1,400,000
square feet.
Other
secondary needs of the flooring, such as appealing aesthetics, cleaner
conditions, and the incorporation of corporate logos, safety lines
and signage had to be met as well, according to Andrew Laurant,
engineer at Lockheed Martin Michoud Operations. The flooring
system would also boost morale and help promote more organized working
conditions, thus boosting overall productivity, added Laurant.
We also wanted the option to have potential problems solved
quickly before and after the flooring system was installed.
Lockheed Martin Operations chose TFR from several companies considered.
TFR had an ideal presentation, great bid package and best
detailed plan for our needs, said Laurant. Each company being
considered was also required to submit a criteria matrix by which
the final contractor, TFR, was selected. The criteria included maintainability,
durability, warranty, experience, and cost.
Production began with tests and an initial assessment conducted
by TFR after the contract was awarded. Initial planning is
a key part of any project, said Richard Coleman, president
of TFR. TFR uses proven methods and practices to make the
map that will give customers the results and quality they need and
expect.
TFR was required to allow numerous production windows to work areas
ranging from as little as 10,000 sq. ft. in a single mobilization.
The turnkey advantage at TFR gives customers great support and
confidence in job performance. TFR has the in-house technical expertise
and experience to resolve any formulation problems and other installation
issues.
TFR also formulated unique systems to isolate the work areas involving
carefully measured floor-to-ceiling curtains and removal of all
materials, including wax leaving a clean surface. The project
work required minimal dust and airborne particles to meet stringent
requirements from prime application of the epoxy flooring materials
and Lockheed Martin Michoud Operations production levels.
Lockheed Martin Michoud Operations benefited from TFRs production,
warranty and installation of a high quality flooring system, mainly
consisting of two coats of superhard epoxy flooring.
Were
very satisfied with TFRs enhancement of the "high-tech" working
environment, productivity, and appearance of the main manufacturing
areas through the installation of an epoxy flooring system,
added Laurant. We saw immediate positive results and appreciated
the flexible scheduling provided by TFR that allowed our production
schedule to easily continue with operations.
The greatest challenge was to provide prompt service while
working under very dynamic schedule situations, said Coleman.
TFR achieved superior intercoat adhesion, high compressive strength,
and no VOCs through turnkey installation. Approximately half of
the three year project was completed in one year.
Customer satisfaction, always a priority at TFR , was very high.
The work ethic of installation crews was outstanding, which
is part of the reason TFR received a performance award the
SFAS (Space Flight Awareness Achievement) award, presented to TFR
at a special ceremony, said Laurant.
Lockheed Martin Michoud Operations greatly benefited with
an updated floor system from long lasting professional materials
and effective labor with minimal disturbances, said Laurant.
The modifications and operational improvements TFR achieved
with the applied epoxy flooring system met and exceeded our level
of quality, cost, safety and reliability.
TFR received numerous compliments on workmanship and dedication
during the project, said Coleman. Its a great
testimony to our workers and their quest to provide quality products
and services, and respond completely to our customers needs.
The NASA Michoud Assembly Facility employees 2,250 workers at its
832-acre facility in New Orleans, La. Since 1973, Michoud Operations
has designed, assembled and tested various structures for aerospace
including Space Shuttle External Tanks, the largest single component
of the Space Shuttle system. Michoud Operations also excels in hybrid
propulsion technology, thermal protection products and extensive
aerospace research and development of space launch systems, advanced
satellites and commercial reusable launch vehicles.